PROMETAI Robot proving ground

Independent test facility · Canada

Test your robot where it will actually work.

Prometai is a neutral proving ground with real homes, offices and work sites built inside. Robot makers, research labs and companies buying robots run repeatable trials and get evidence they can trust, before a robot ships or before they buy one.

Become a founding partner See the test zones →

Phase 1 (homes and offices) is in planning. Founding partners help decide what we build first.

Site plan — draftNot to scale
A Phase 1
Home Kitchen · living room · laundry · bedroom · bathroom
B Phase 1
Office Open office · meeting room · reception
C Phase 2
Warehouse & retail Racking · shelves · checkout · dock
D Phase 2
Industrial Assembly cell · workbench · tool wall
E Phase 3
Secure zone Public safety & defence lanes
Control room Every trial filmed and logged
Phase 1 Phase 2 Phase 3 (later)

01 — Why Prometai

Demos aren't deployments.

Most testing happens in a few tidy scenes.

Robots are usually evaluated in the developer's own space, on a handful of setups, with too few trials to say how often they really succeed.

Simulation only goes so far.

Clutter, changing light, worn surfaces and unfamiliar objects break policies that looked solid in sim. You only find out in the real world.

No one neutral is keeping score.

Makers grade their own robots and buyers rely on vendor demos. There's no independent place to compare robots on the same tasks.

02 — Test zones

Real rooms, rebuilt for every trial.

Each zone is a full-size set that we rearrange between trials: furniture moved, objects swapped, lighting changed. A robot never gets graded on a scene it has memorized.

Phase 1 Zones A–B

Homes & offices

  • Tidying, laundry and folding
  • Loading and unloading a dishwasher
  • Fetching and carrying objects
  • Doors, drawers and appliances
  • Office restocking and deliveries
  • Moving safely around people and clutter
Phase 2 Zones C–D

Commercial & industrial

  • Picking and packing orders
  • Restocking shelves
  • Tote and bin handling
  • Light assembly and kitting
  • Loading-dock moves
Phase 3 · Later Zone E

Public safety & defence

A separate, secured zone with standard response-robot test lanes: mobility, dexterity, inspection and handling in tough conditions.

Planned for a later phase. Access will follow Canada's Controlled Goods Program requirements.

Option

Bring a model, not a robot.

Prefer not to ship hardware? Send us a policy checkpoint and we run it on our in-house robots, on the same tasks as everyone else.

Option

Turn trials into training data.

The same runs can be recorded as training data, including the failure cases your model needs most.

03 — How it works

One test campaign, start to finish.

  1. 01

    Tell us what to test

    Your robot or your model, the tasks that matter to you, and what counts as success.

  2. 02

    We set the scene

    Our team builds the setups, sources the objects and plans the variations, then resets everything between trials.

  3. 03

    We run blind trials

    Trained operators run repeated trials without knowing which version is which, and log video and robot data for every run.

  4. 04

    You get the evidence

    Success rates with confidence intervals, a searchable library of failure clips, and the raw logs.

04 — Who it's for

Built for the teams that make, study and buy robots.

Robot makers & startups

Show customers and investors results you didn't grade yourself, and find failure modes before your customers do.

Research labs

Evaluate policies across many real scenes without building and maintaining them in your own space.

Test before you buy

Companies buying robots

Bring two or three vendors, run your own tasks side by side, and decide on evidence instead of demos.

Public agencies and defence teams: talk to us about Phase 3.

05 — Founding partners

Help us build the test site your robots need.

We're confirming demand before we build. Founding partners decide which zones and tasks come first, and get priority booking once Phase 1 opens.

  • Shape the first zones and test protocols
  • Priority booking when Phase 1 opens
  • Founding-partner terms: [YOUR TERMS]

Takes about two minutes. No commitment.

Robot type
Budget per test campaign (CAD)
When would you need it?

We only use your answers to contact you about Prometai. [PRIVACY POLICY LINK]

06 — FAQ

Before you ask.

Is the facility open?

Not yet. We're signing founding partners and confirming demand before we build Phase 1.

Where will it be?

In Canada. Site selection is under way: [CITY — TO CONFIRM].

Do we have to ship our robot?

No. Ship a robot if you want it tested as-is, or send a model and we'll run it on our in-house robots.

Who owns the results?

You do. Video, logs and reports from your trials belong to you unless we agree otherwise in writing.

Which standards do you follow?

We're designing our protocols around published methods, such as ASTM's standard test methods for response robots and ISO 13482 for personal care robots.

Do you test defence systems?

Later. A separate secured zone is planned for Phase 3, run under Canada's Controlled Goods Program.

Robots get judged in the real world. Test them there first.

Become a founding partner